Horizontal Directional Drilling

Directional Drilling

Horizontal Directional Drilling

Trenchless bores for sensitive and congested corridors

Overview

Our Horizontal Directional Drilling crews install water, gas, power, and telecommunications lines beneath roads, rail corridors, wetlands, and waterways without open-cutting the surface. Every bore begins with a full utility locate and a steerable pilot path engineered around existing infrastructure, followed by reaming and pullback of the product pipe using guided tracking systems accurate to within inches. HDD keeps traffic moving, protects sensitive environments, and shortens permitting timelines compared to open-trench alternatives.

Specifications

Max Bore Length
1,200 m
Pipe Diameter
25 – 900 mm
Steering Accuracy
± 5 cm
Typical Duration
2 – 10 days