
Directional Drilling
Horizontal Directional Drilling
Trenchless bores for sensitive and congested corridors
Overview
Our Horizontal Directional Drilling crews install water, gas, power, and telecommunications lines beneath roads, rail corridors, wetlands, and waterways without open-cutting the surface. Every bore begins with a full utility locate and a steerable pilot path engineered around existing infrastructure, followed by reaming and pullback of the product pipe using guided tracking systems accurate to within inches. HDD keeps traffic moving, protects sensitive environments, and shortens permitting timelines compared to open-trench alternatives.
Specifications
- Max Bore Length
- 1,200 m
- Pipe Diameter
- 25 – 900 mm
- Steering Accuracy
- ± 5 cm
- Typical Duration
- 2 – 10 days